Table 30.3-1. Steps to Determine C&C Wind Loads for Enclosed, Partially Enclosed, and Partially Open Low-Rise Buildings.
Step 1: Determine risk category; see Table 1.5-1.
Step 2: Determine the basic wind speed, V, for applicable risk category; see Figure. 26.5-1.
Step 3: Determine the wind load parameters:
  • Wind directionality factor, Kd; see Section 26.6 and Table 26.6-1.

  • Exposure Category B, C, or D; see Section 26.7.

  • Topographic factor, Kzt; see Section 26.8 and Figure 26.8-1.

  • Ground elevation factor, Ke; Section 26.9 and Table 26.9-1.

  • Enclosure classification; see Section 26.12.

  • Internal pressure coefficient, (GCpi); see Section 26.13 and Table 26.13-1.

Step 4: Determine velocity pressure exposure coefficient, Kh; see Table 26.10-1.
Step 5: Determine velocity pressure, qh, Equation (26.10-1).
Step 6: Determine external pressure coefficient, (GCp):
  • Walls; see Figure 30.3-1.

  • Flat roofs, gable roofs, hip roofs; see Figure 30.3-2.

  • Stepped roofs; see Figure 30.3-3.

  • Multispan gable roofs; see Figure 30.3-4.

  • Monoslope roofs; see Figure 30.3-5.

  • Sawtooth roofs; see Figure 30.3-6.

  • Domed roofs; see Figure 30.3-7.

  • Arched roofs; see Figure 30.3-8.

  • Bottom horizontal surface of elevated buildings; see Section 30.3.2.1.

Step 7: Calculate wind pressure, p; Equation (30.3-1).